ESG

Environmental Sustainability

Environmental Protection

▍Environmental Commitment
Based on climate change and the impact that humans have had on earth, the Company should implement corporate green responsibilities and pay attention to the rights and interests of all stakeholders. Further, the Company should incorporate a corporate sustainable management strategy into corporate management and operational behavior. Brogent is committed to implementing environmental protection-related management and actively implements the energy conservation policy, providing corresponding resources to fulfill its corporate responsibility to environmental protection.



Water Resource Management
Brogent's water withdrawal, discharge, and consumption from 2023 to 2025 have not been disclosed due to the difficulty in collecting data from the Taipei office. Therefore, its data only includes the Kaohsiung headquarters and Manufacturing Center (Taoyuan Plant) in Taiwan. In addition, the water withdrawal, discharge, and consumption by Brogent from operations are not located in areas with water stress and will not have a significant impact on the surrounding environment.

According to the data of water withdrawal, discharge, and consumption presented in table, the Company's water usage in 2025 shows that was primarily from office domestic water use, with third-party water (tap water) being 10.354 million liters (82.02%), followed by surface water (rainwater harvesting) 2.269 million liters (17.98%); the total water withdrawal amounted to 12.623 million liters,equivalent to 0.038 million liters per person per year.

In addition, Brogent has adopted water conservation and reclaimed water utilization to effectively manage and properly utilize water resources. For example, faucets, urinals, and toilets with water saving labels are installed in all the bathrooms, and a rainwater harvesting storage system is established to reclaim rainwater for plant watering to improve utilization efficiency.



Waste Management
Brogent actively cooperates with government policies to set up general waste and recycling collection points on each floor, and implements waste sorting operations through all employees and cleaning staffs to improve recycling efficiency. General industrial waste includes not only waste generated by colleagues in their daily official duties, administration or office work, but also the waste generated during the process of production of the simulator rides, which is mostly manufactured by third parties, shipped to the Company for pre-assembly testing, and then sent to customers for installation, testing, delivery and acceptance.

Brogent engages qualified contractors to handle general industrial waste. The waste directed to disposal of incineration (including energy recovery) from 2023 to 2025 is not weighed by the Taipei office, so the data cannot be obtained. Therefore, its data only includes the Kaohsiung headquarters and Manufacturing Center (Taoyuan Plant) in Taiwan. The data on waste disposal and transfer of other recovery operations cannot be obtained because the Manufacturing Center (Taoyuan Plant) and Taipei office were not weighed, so the data only includes the Kaohsiung headquarters in Taiwan.

Through the waste generated table, it can be seen that the waste directed to disposal is 15.21 metric tons, the waste disposal and transfer is 1.69 metric tons, and the total volume of general industrial waste is 16.90 metric tons in 2025. In addition, Brogent's Kaohsiung headquarters is actively involved in social relief. From 2023 to 2025, it donated recyclable items to Non-Governmental Organization for processing and reuse free of charge.



 
*

▍Green Buildings

After the original certification unit "Taiwan Architecture & Building Center" verified on site that the current status matches the original design on November 25, 2021, it approved the extension of the Green Building Label of Brogent's R&D Testing and Experience Center for five years until December 15, 2026. In addition, we will apply for the green building label after the completion of the new plan of the Ciaotou Science Park, and at the same time, we will incorporate the installation of solar panels on the roof of the building as an essential facility for power generation.